should I use stone under my cellar floor
The will be removed the next day and leave a 2 inch wide gap to collect any water that leaks from the foundation walls. Install rock in the 2 inch gap and at the same level as the new concrete floor. Cut a groove in the sump bucket where it contacted the styro so the water from the 2 inch gap can run into the bucket.